Sunday, 24 February 2013

Production log 3




Production log 3


What have you contributed to this week?

This week we started with our filming and throughout the week me and my partner have switched the director and filming role as he is better suited with the camera than me, but we have both equally shared each role. During the week we have filmed the majority of the shots, but still have some to do inside school which should work out fine and also we have kept too our filming schedule quite well and have added in a few extra shots as we thought some of the new shots would work better than the ones we already thought of doing, but will still kept the same concept.

How does this fit in to your production schedule/job roles/overall ideas of the project?

Overall the filming has fit in to our schedule quite well and me and my partner have switched the director and filming roles as it through the first day of filming it seems as the filming role was better for him while director was better for me. Also the footage that we have filmed so far looks like how we want our idea to come out like, which is a good thing.


Were there any problems?

On the first day of filming we did have quite a big problem as the tri-pod was unable to stay in one position, which came to be quite a hassle, so we had to try and find another tri-pod which we did in the end, other than that the filming went quite well.

What are your plans for the following week?

The plans for this week shall be to get the final shots that we need in school of the band performance and also we might upload the footage we have already got and see if we need to re-shoot anything.