Sunday, 24 March 2013
Production log 7
Production log 7
What have you contributed this week?
Overall this week there wasn't really much we have done as all we needed to is add the final touches to our music video such as matching the lip sync more and adding in a few more close ups in certain shots we didn't take us long to do at all. After we had finally finished it we uploaded it to YouTube, and I am quite happy how it has turned out.
How does this fit in to your production schedule/job roles/overall ideas of the project?
It fits in with our production schedule as we have finished our music video on time and overall I think our music video has turned out quite good and how looks how we wanted it to.
Were there any problems?
During this week there was no problems at all as we new what we had to add to our music video to make it better and it didn't take the long to do. Its quite a good thing that there wasn't any massive things we needed to change in our music video as it may of took slightly longer to get it all back in place and match the tempo of the song.
What are your plans for the following week?
The plans for the following week are to complete regulations and constraint forms, as we have finally finished our music video so this is all we have left to do.
Friday, 22 March 2013
Sunday, 17 March 2013
Production log 6
Production Log 6
What have you contributed this week?
This week was to get our draft version of our music video finished by Thursday which we did, and we got feedback from the rest of the class and our teacher on what we need to improve on in our music video and if we have to re-shoot anything. Luckily we dont need to add in much just more close ups during the second verse and parts of the band performance, some transitions and also to make the green screen look more tidy.
Overall this week has fitted into are production schedule quite well as we have finished the draft version of our music video to the deadline and all we have to do now is add a few more things to it.
Were there any problems?
During this week there wasn't really any problems when it came to the editing besides the chroma key as some of the green from the shots were harder to remove than others, but we got the majority of the green out.
What are your plans for the following week?
This week is our final we on the editing of our music video, so during this week we will be finishing it of in lesson and also staying after school for some days as well, so hopefully we will be finished by the deadline.
Sunday, 10 March 2013
Production log 5
Production log 5

This week we have carried on from last week which is the editing stage and also this week we have re-shot some of our green screen we did the previous week. Overall this week has just been an continuation from last week and the editing that we have done is looking quite cool.
How does this fit in to your production schedule/job roles/overall ideas of the project?
Even though we had to re-shoot green screen shots this week it didn't effect our production schedule as they were small parts which is quite good and from the looks of our edited footage our music video seems to be how we wanted it to be.

Were there any problems?
During this week the only problem that really occurred was having to re-shoot some of the green screen shots as it when filming it the first time I fiddled with the camera too much and when we went over the clips during edit it missed out the main parts we needed. But, re-shooting didn't take long and now we have more of a variety of camera movement for those scenes.

What are your plans for the following week?
For this week the plans are to get a edited draft of our music video finished by Thursday so that we have the weekend to re-shoot if we need to, other than that its just editing until we have got a draft of our music video.
Sunday, 3 March 2013
Production log 4
Production log 4
What have you contributed this week?
During this week we have completed the last part of our filming which was the green-screen, band performance scene and also have got all of the mini sketches recorded. We have imported all of our footage into the Mac and have started to put some of the clips together in final cut pro. Overall this week has gone quite good.
How does this fit in to your production schedule/job roles/overall ideas of the project?
All the filming has been done to the schedule and also I have noticed that we have started to edit our clips quite early than from the schedule but this isn't a problem at all. The overall idea of the project seems to have come out quite well due to the clips we have already put together its looks exactly like how we planned it, which is a cool thing.
Were there any problems?

During this week there wasn't any problems at all, we have completely finished our filming and have already started to editing them all together. The only problem that would really have effect would be if we need to re-shoot vital scenes, as the blow up doll has decided to create a rip which makes it keep deflating.
What are your plans for the following week?
For the coming week both me and my partner will continue editing, and if we notice along the way that we need to re-shoot some shots we will try and do it.
Sunday, 24 February 2013
Production log 3
Production log 3
What have you contributed to this week?
This week we started with our filming and throughout the week me and my partner have switched the director and filming role as he is better suited with the camera than me, but we have both equally shared each role. During the week we have filmed the majority of the shots, but still have some to do inside school which should work out fine and also we have kept too our filming schedule quite well and have added in a few extra shots as we thought some of the new shots would work better than the ones we already thought of doing, but will still kept the same concept.
How does this fit in to your production schedule/job roles/overall ideas of the project?
Overall the filming has fit in to our schedule quite well and me and my partner have switched the director and filming roles as it through the first day of filming it seems as the filming role was better for him while director was better for me. Also the footage that we have filmed so far looks like how we want our idea to come out like, which is a good thing.
Were there any problems?
On the first day of filming we did have quite a big problem as the tri-pod was unable to stay in one position, which came to be quite a hassle, so we had to try and find another tri-pod which we did in the end, other than that the filming went quite well.
What are your plans for the following week?
The plans for this week shall be to get the final shots that we need in school of the band performance and also we might upload the footage we have already got and see if we need to re-shoot anything.
Subscribe to: